Real estate, facilities and events simulation
People move through buildings, venues and lots where elevators, exits and entrances limit flow. Stocha is designed to test 4 decisions here, each as a ready-made model template.
What Stocha measures
- Wait for an elevator
- Time to clear the venue
- Entry gate queue length
- Parking lot fill over time
- Gate and elevator utilization
Decisions you can test
Packs are planned. The first wave ships with the private beta.
- Elevator systemsDoes destination dispatch shorten morning rush wait times compared with the current elevator controls?
- Building evacuationCan everyone leave the building within your target if one stairwell is blocked?
- Trade show and event flowHow many registration desks and entrances keep opening morning lines within your target?
- Parking facilityHow many entry and exit lanes keep cars from backing onto the street after events?
Questions about real estate, facilities and events simulation
How many gates and staff do I need for venue entry?
Model fans arriving in the hour before the event, the screening time per person and the gates and staff. Run it many times for each plan and read the longest line and the time until everyone is inside before the start. Arrivals bunch near the start, so plan for the peak, not the average.
Are facilities and event templates available?
Not yet. Real estate, facilities and events templates are planned after the private beta. You can describe your own building or venue in plain words instead.
Test a decision like these
Join the waitlist and we will tell you when the beta opens.
Join the waitlist